Work Day November 14

Had a productive day refitting all the lamp lenses on P-Rack. The simulator ran well again following an initial problem with a WEETABIX card at power on, not a fault as such as the WEETABIX cards just needed pulling and re inserting. The simulator ran well apart from a couple of display (mains) glitches which always happen at lunch time. The reliability of the simulator is now so good we refitted the covers to the computer racks! Trying to develop a PeriBus simulator. Yet to be completed but the timing of the serial PeriBus L5 and L6 is done as is one of the L1/L4 lines. This will enable us to drive the I/O cards for stand-alone testing.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s