Work Day July 9

Another fantastically boring but therapeutic (according to Neil) day as we continued with the master plan of getting the LCP repainted before the end of summer. The rear wall of the cabin is now completely stripped and ready for a gentle rub down before painting, thanks to Neil’s efforts this morning. The majority of the day was spent on the side wall of the cabin as shown in the before and after photos attached. Hard work, especially cleaning all the rivet heads and roof catches. Another full day should see this side wall finished. The hot air guns are still working at maximum efficiency as Neil can testify after burning his hand so next time you are with us please ask to see his scars.LCP Paint Strip 7-9-16 1   LCP Paint Strip 7-9-16 3

A couple of photos of the T86 attached to prove it’s still there.

T86 in Hangar 5 2   T86 in Hangar 5.jpg

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s