Work Day 18th August 2018

Saturday was all about painting the cabin after many weeks of preparation. The front and left hand side walls have at last received their top coat of paint. The mottling is paint that is still wet.

T86 Cabin Top Coat wm.jpg

The next few weeks will see the remaining cabin walls painted and the roof. Chillers and A/C covers are also ready for painting. The seals around the A/C units will be changed and receive with anti-corrosion treatment we will  repaint the roof switch enclosure.

Here is the roof switch enclosure showing the work needed on its internals.

T86 Roof Safety Switch wm

The corrosion on the inside of the roof switch cover is evident and has been removed for off-site treatment.

T86 Roof Switch Cover Corrosion.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s