Work Day 19th September 2020

Now that the internal faces of the LCP roof sections have been repainted
preparation work has stated on the cabin walls prior to their repaint. The
accompanying photo shows the cabin wall where the Zero Volts test set
resides before rub down. The engrained dirt is plain to see.

Most of the LCP roof lights have now been replaced after refurbishing.
The accompanying photo shows one of the refurbished lights refitted to the freshly painted roof .

As only two of the original diffusers remain we are pushing ahead with plans to recreate new diffusers as near to the originals as possible.

Pete H