Work Day 11th December 2021

T86
Work is now underway on the chassis to remove lose paint and wire brushing everything; a dusty and dirty job. See the two accompanying photos below.

Note that the two chillers in one of the photos have been disconnected. It is assumed this was done when the radar was ‘out of use’ at West Raynham. Quite a few paint colours on display, the pale green is believed to be an original primer, bronze green (original top coat) and red lead used for touching up over the years, finally the odd splash of a later green from a spray gun at some time.

LCP
With the cold and damp weather this time of year it’s a good excuse to carry out a warm task. A job started a while back was to rejuvenate the plastic knobs and lamp covers. This involves cleaning all the lamp covers and knobs and, when dry, treating them with Polytrol. See the before and after photos of some of the lamps. Note the handles and catches, all re chromed.

Pete H

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: